805-0104 AES Cabinet C&I Installation Manual

PCS Closed-Loop Communication

A closed-loop configuration is mandatory for stable and safe system operation. If communication is lost, the AES battery cabinet will initiate a shutdown, fulfilling Rapid Shutdown compliance requirements.

Closed-loop communication is essential for the safe operation of the AES battery cabinet.

image-20250605-224542.png

LYNK II Communication Connection Example

LYNK II Communication Gateway with PCS

When properly connected to a closed-loop network and configured, the LYNK II Communication Gateway enables seamless communication between the AES battery cabinet and the PCS. Once set up, the LYNK II will:

  • Transmit real-time battery parameters, including voltage, current, temperature, and state of charge (SOC), to the inverter.

  • Relay charge/discharge voltage and current limits from the AES battery cabinet to the inverter for optimized battery management.