COMMISSIONING PROCEDURE
Pre-Commissioning Checklist
Verify the inverter firmware is up to date.
Verify System
Verify all breakers and disconnects (DC and AC) are in the OFF position.
Inspect Connections
Verify the polarity of all DC connections.
Verify all AC and communication connections are secure and correct.
Inverter Pre-Commissioning
Before you start the system, complete all pre-commissioning checks outlined in the Sol-Ark inverter manual. These include:
Verifying all mechanical and electrical connections
Confirming proper ventilation and secure mounting
Preparing tools (e.g., multimeter) and the MySolArk mobile app for setup and remote monitoring
For instructions, refer to the Sol-Ark 60K-3P-480V C&I Installation Guide and User Manual.