This checklist is used to ensure the proper decommissioning and disassembly of the AES battery cabinet energy storage system. Additional system-level decommissioning procedures may be required for interconnected equipment.

Disconnection and Safety Procedures

PROCEDURE

CHECK

Open all disconnects

Ensure there is no electrical connection to any externally connected Hybrid Inverter System.

De-energize internal busbars

Confirm the system is completely powered down and no voltage is present. Use a multimeter for verification.

Disconnect external power sources

Ensure all AC and DC power sources have been safely disconnected and verified with a multimeter.

Isolate Battery Packs

Pull the MSD from each battery pack one by one and confirm no voltage is present on battery cables.

Disassembly of the AES 210HV

PROCEDURE

CHECK

Remove battery cabinet covers

Carefully remove the covers and shields for access to the internal components.

Disconnect connections

Disconnect all external connections from the battery and inverter.

Release cabinet anchors

Unscrew and remove all anchor bolts securing the AES 210HV to the concrete pad.

Remove the battery cabinet

Safely remove the cabinet from its installed location using appropriate equipment.

Disposal and Recycling

PROCEDURE

CHECK

Recycle components

Recycle all recyclable components in accordance with local and national recycling regulations.

Dispose of non-recyclable components

Properly dispose of all non-recyclable components according to local waste disposal guidelines.