Set the LYNK II communication protocol and configure the closed-loop setting on the Solis inverter-charger.
LYNK II Protocol
-
Download the current version of LYNK ACCESS software from the Discover Energy Systems website to obtain the most up-to-date suite of available protocol configurations.
-
Using a USB cable with a Type-B mini-plug, connect the 64-bit Windows 10 / 11 device running LYNK ACCESS software to the USB port on LYNK II. Ensure LYNK II is powered and connected correctly to the Solis inverter-charger’s BMS port.
-
Open LYNK ACCESS. Options for configuration and settings are found by selecting the LYNK tab.
-
Connect the LYNK II and open LYNK ACCESS. Ensure that you only have one LYNK device connected to the Computer.
-
Open LYNK ACCESS and select the LYNK tab. Select the blue gear icon in the upper right area of the CAN Settings tile.
-
Select the pre-configured Solis protocol to complete the closed-loop configuration for LYNK II. Click SAVE to confirm the configuration.
|
NOTE |
|---|
|
Saving configuration changes using LYNK ACCESS will automatically cause LYNK II to
|