INTRODUCTION
This Application Note provides information about integrating LYNK network-enabled Discover Lithium Batteries using the LYNK II Communication Gateway with Selectronic power conversion devices in a managed (closed-loop) configuration.

Before installation and configuration, consult the relevant product documentation, including Manuals, Application Notes, Installation, and Configuration Guides.
Selectronic Documentation
SP PRO 2i Instruction Manual
SP PRO Series 2i datasheet
Instruction Manual for SP LINK - Configuration and monitoring for SP PRO Series 2i
Visit https://www.selectronic.com.au for the most recent version of published documents.
Discover Energy Systems Documentation
AES RACKMOUNT datasheet (808-0039)
HELIOS ESS Installation and Operation Manual (805-0090)
LYNK II Installation and Operation Manual (805-0033)
Visit https://discoverenergysys.com for the most recent version of published documents.
The LYNK II Communication Gateway is compatible with the following batteries and inverters.
Discover Lithium Batteries
A Discover battery must have a compatible network port, such as a LYNK Port, for communicating with a LYNK II device.
AES RACKMOUNT: 48-48-5120, 48-48-5120-H
HELIOS ESS: 52-48-16000
The LYNK II Communication Gateway is compatible with the following Selectronic devices:
Selectronic Inverters
SPMC480-AU
SPMC481-AU
SPMC482-AU
NOTE |
---|
Selectronic SP PRO 2i Instruction Manual
|