This Application Note provides information about integrating LYNK network-enabled Discover Lithium Batteries using the LYNK II Communication Gateway with Selectronic power conversion devices in a managed (closed-loop) configuration.
Before installation and configuration, consult the relevant product documentation, including Manuals, Application Notes, Installation, and Configuration Guides.
Selectronic Documentation
-
SP PRO 2i Instruction Manual
-
SP PRO Series 2i datasheet
-
Instruction Manual for SP LINK - Configuration and monitoring for SP PRO Series 2i
Visit https://www.selectronic.com.au for the most recent version of published documents.
Discover Energy Systems Documentation
-
AES RACKMOUNT datasheet (808-0039)
-
HELIOS ESS Installation and Operation Manual (805-0090)
-
LYNK II Installation and Operation Manual (805-0033)
Visit https://discoverenergysys.com for the most recent version of published documents.
The LYNK II Communication Gateway is compatible with the following batteries and inverters.
Discover Lithium Batteries
A Discover battery must have a compatible network port, such as a LYNK Port, for communicating with a LYNK II device.
-
AES RACKMOUNT: 48-48-5120, 48-48-5120-H
-
HELIOS ESS: 52-48-16000
The LYNK II Communication Gateway is compatible with the following Selectronic devices:
Selectronic Inverters
-
SPMC480-AU
-
SPMC481-AU
-
SPMC482-AU
|
NOTE |
|---|
|
Selectronic SP PRO 2i Instruction Manual
|