Completing the Commissioning Process
Document System Settings and Test Results
Record all configured settings, including voltage, current limits, charge/discharge parameters, and communication settings.
Log system test results, such as battery health checks and communication verification.
Maintain this documentation for future reference, troubleshooting, and compliance requirements.
User Training
Provide system users with a thorough overview of operational procedures, safety precautions, and basic troubleshooting steps.
Demonstrate how to monitor system performance using the inverter or LYNK II interface.
Ensure users understand alarms, fault codes, and recommended corrective actions.
Operation & Maintenance (O&M) Scheduling
Establish a preventive maintenance schedule in collaboration with site operators.
Define periodic inspection intervals for battery health, connections, the thermal management system, and firmware updates.
Document maintenance procedures and responsibilities to ensure long-term reliability.
Product Registration & Warranty Compliance
Register the product per the warranty instructions to activate coverage and ensure eligibility for support.
Verify that all installation documentation is complete and meets warranty requirements.
Additional Support & Troubleshooting
Refer to the product manuals for detailed system configurations, troubleshooting procedures, and firmware updates.
Contact technical support for system-specific assistance or if further guidance is required.
These final steps ensure system reliability, compliance, and ease of future maintenance.