Pre-Commissioning Checklist
Verify the inverter firmware is up to date.
Verify System
-
Verify all breakers and disconnects (DC and AC) are in the OFF position.
Inspect Connections
-
Verify the polarity of all DC connections.
-
Verify all AC and communication connections are secure and correct.
Inverter Pre-Commissioning
Before you start the system, complete all pre-commissioning checks outlined in the Sol-Ark inverter manual. These include:
-
Verifying all mechanical and electrical connections
-
Confirming proper ventilation and secure mounting
-
Preparing tools (e.g., multimeter) and the MySolArk mobile app for setup and remote monitoring
For instructions, refer to the Sol-Ark 30K-3P-208V or 60K-3P-480V C&I Installation Guide and User Manual.