Skip to main content
Skip table of contents

INTRODUCTION

This guide provides information on integrating the AES 210HV high-voltage battery cabinet and the LYNK II Communication Gateway with the Solis S6-EH3P inverter.. It is not a comprehensive step-by-step guide for every possible installation scenario. Each installation may present unique conditions or specific use cases that require custom configurations or adjustments to recommended values. For additional details and advanced configurations, refer to the supporting documents below.

Qualified installers must have the expertise to evaluate and adapt to the specific requirements of the installation site, ensuring the system is configured for optimal performance and safety. The installer must always consider the application’s unique aspects and adjust settings accordingly.

Before installation or configuration, review all relevant documentation, including product manuals, application notes, installation guides, and configuration guides.

Solis Documentation

Visit solisinverter.com for the latest Solis product manuals, configuration guides, and firmware updates.

Discover Energy Systems Documentation

Visit http://www.discoverenergysys.com for the most recent version of published documents.

  • AES 210HV Installation and Commissioning Manual (805-0092)

  • LYNK II Installation and Operation Manual (805-0033)

Review these documents for the installation and operation of the system.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.