COMMISSIONING

NOTE

Commissioning must be performed by a CEC-accredited installer in accordance with AS/NZS 4777.1 and AS/NZS 5139.

Pre-Commissioning Checklist

Verify Inverter Firmware is Up-to-Date

Check and confirm that the latest firmware is installed.

  • To see if there is a newer version available:

    • Settings > Device Upgrade

Verify System

  • Verify all breakers and isolators (DC and AC) are in the OFF position.

Inspect Connections

  • Verify the polarity of all DC connections.

  • Verify all AC and communication connections are secure and correct.

Inverter Pre-Commissioning

Before starting the system, complete all pre-commissioning checks outlined in the Solis inverter manual. These include:

  • Verify all mechanical and electrical connections

  • Confirm proper ventilation and secure mounting

  • Prepare tools (e.g., multimeter) and the SolisCloud mobile app for setup and monitoring

For complete instructions and app registration steps, refer to the Solis S6-EH3P inverter manual