NOARK Self-Managed (Open-Loop) Configuration
If managed (closed-loop) communication cannot be established, the NOARK inverter-charger will need to be manually converted to a self-managed (open-loop) configuration. For battery values, refer to the latest Discover Lithium battery documentation. For details on menu navigation and the setup procedure, refer to the latest NOARK documentation.
-
Set the Discover Lithium batteries to ON and set the inverter-charger to ON.
-
Using the touch screen and keypad on the inverter, navigate to Main Screen > System Setup > Battery Setting.
-
Specify the battery settings according to the instructions in the tables that follow. Touch the Up and Down arrows to scroll through screens.
-
Touch the check mark button to save changes.
-
Exit and restart the inverter-charger.
|
NOTE |
|---|
|
If using multiple inverter-chargers, configure NOARK inverter-chargers to operate in parallel before setting the parameters for battery operation. |