SYSTEM START-UP AND COMMISSIONING
NOTE |
|---|
Follow these steps as a general guideline for system startup and commissioning. For detailed, model-specific procedures, including configuration, safety checks, and integration requirements, refer to the inverter or Power Conversion System (PCS) integration guide. |
Pre-Start-Up Checks
Normal Start-Up Procedure
System Commissioning
PROCEDURE | CHECK |
| |
| |
| |
| |
| |
| |
| |
Documentation: Document the commissioning process, including test results, performance, faults, system configurations, and any system behavior anomalies for future reference.
| |
| |
Normal Shutdown Procedure
PROCEDURE | CHECK |
| |
| |
| |
| |
Note: The DC Disconnect has a built-in locking tab. Secure it in the OFF position with the locking mechanism so the system remains de-energized during maintenance. Verify with a voltmeter or other voltage sensing device that the AC and DC lines are no longer electrically live.
| |
| |
| |
Engage Lockout/Tagout (LOTO): Follow proper Lockout/Tagout (LOTO) procedures, place signs at the battery cabinet, disconnect, AC supply disconnect, etc ensuring the signs remain in place until all work is complete and the system is verified safe for re-energization.
| |