This checklist is used to ensure the proper decommissioning and disassembly of the AES battery cabinet energy storage system. Additional system-level decommissioning procedures may be required for interconnected equipment.
Disconnection and Safety Procedures
|
PROCEDURE |
CHECK |
|---|---|
|
Open all disconnects |
Ensure there is no electrical connection to any externally connected Hybrid Inverter System. |
|
De-energize internal busbars |
Confirm the system is completely powered down and no voltage is present. Use a multimeter for verification. |
|
Disconnect external power sources |
Ensure all AC and DC power sources have been safely disconnected and verified with a multimeter. |
|
Isolate Battery Packs |
Pull the MSD from each battery pack one by one and confirm no voltage is present on battery cables. |
Disassembly of the AES 210HV
|
PROCEDURE |
CHECK |
|---|---|
|
Remove battery cabinet covers |
Carefully remove the covers and shields for access to the internal components. |
|
Disconnect connections |
Disconnect all external connections from the battery and inverter. |
|
Release cabinet anchors |
Unscrew and remove all anchor bolts securing the AES 210HV to the concrete pad. |
|
Remove the battery cabinet |
Safely remove the cabinet from its installed location using appropriate equipment. |
Disposal and Recycling
|
PROCEDURE |
CHECK |
|---|---|
|
Recycle components |
Recycle all recyclable components in accordance with local and national recycling regulations. |
|
Dispose of non-recyclable components |
Properly dispose of all non-recyclable components according to local waste disposal guidelines. |