Skip to main content
Skip table of contents

Deye

Introduction

This section provides information about integrating LYNK and AEbus network-enabled Discover Lithium Batteries using the LYNK II Communication Gateway with Deye power conversion devices in a closed-loop configuration.

Before installation and configuration, consult the relevant product documentation, including Manuals, Application Notes, Installation and Configuration Guides.

Deye Documentation

Visit https://www.deyeinverter.com/ for the most recent version of published documents.

Discover Energy Systems Documentation

Visit https://www.discoverenergysys.com for the most recent version of published documents.

  • AES RACKMOUNT Installation and Operation Manual (805-0043)

  • AES RACKMOUNT datasheet (808-0039)

  • HELIOS ESS Installation and Operation Manual (805-0090)

  • HELIOS ESS datasheet (808-0046)


Discover Lithium Batteries

A Discover battery must have a compatible network port, such as a LYNK Port or AEbus Port, for communicating with a LYNK II device.

  • AES RACKMOUNT: 48-48-5120, 48-48-5120-H

  • HELIOS ESS: 52-48-16000

Deye Inverters

The LYNK II Communication Gateway is compatible with the following Deye devices:

Single Phase

  • SUN-5/6/7.6/8K-SG01LP1-US

  • SUN-7.6/8/12/14/16K-SG01LP1-EU

  • SUN-7.6/8/10/12K-SG02LP1-EU-AM2/AM3

  • SUN-3.6/5/6K-SG03LP1-EU

  • SUN-3/3.6/5/6K-SG04LP1-EU

  • SUN-3.6/5/6/7.6/8K-SG05LP1-EU

Split Phase / Three Phase

  • SUN-5/6/7.6/8/10/12K-SG02LP2-US-AM2/AM3

Three Phase

  • SUN-5/6/8/10/12K-SG04LP3-EU

  • SUN-3/4/5/6/8/10/12K-SG05LP3-EU-SM2

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.