Skip to main content
Skip table of contents

Selectronic

This section provides information about integrating LYNK and AEbus network-enabled Discover Lithium Batteries using the LYNK II Communication Gateway with Selectronic power conversion devices in a managed (closed-loop) configuration.

Before installation and configuration, consult the relevant product documentation, including Manuals, Application Notes, and Installation and Configuration Guides.

Selectronic Documentation

Visit https://www.selectronic.com.au for the most recent version of published documents.

  • SP PRO 2i Instruction Manual

  • SP PRO Series 2i datasheet

  • Instruction Manual for SP LINK - Configuration and monitoring for SP PRO Series 2i

Discover Energy Systems Documentation

Visit https://www.discoverenergysys.com for the most recent version of published documents.

  • AES RACKMOUNT Installation and Operation Manual (805-0043)

  • AES RACKMOUNT datasheet (808-0039)

  • HELIOS ESS Installation and Operation Manual (805-0090)

  • HELIOS ESS datasheet (808-0046)


Discover Lithium Batteries

A Discover battery must have a compatible network port, such as a LYNK Port or AEbus Port, for communicating with a LYNK II device.

  • AES RACKMOUNT: 48-48-5120

  • HELIOS ESS: 52-48-16000

Selectronic Inverters

The LYNK II Communication Gateway is compatible with the following Selectronic inverters:

  • SPMC480-AU

  • SPMC481-AU

  • SPMC482-AU

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.