Selectronic
This section provides information about integrating LYNK and AEbus network-enabled Discover Lithium Batteries using the LYNK II Communication Gateway with Selectronic power conversion devices in a managed (closed-loop) configuration.
Before installation and configuration, consult the relevant product documentation, including Manuals, Application Notes, and Installation and Configuration Guides.
Selectronic Documentation
Visit https://www.selectronic.com.au for the most recent version of published documents.
SP PRO 2i Instruction Manual
SP PRO Series 2i datasheet
Instruction Manual for SP LINK - Configuration and monitoring for SP PRO Series 2i
Discover Energy Systems Documentation
Visit https://www.discoverenergysys.com for the most recent version of published documents.
AES RACKMOUNT Installation and Operation Manual (805-0043)
AES RACKMOUNT datasheet (808-0039)
HELIOS ESS Installation and Operation Manual (805-0090)
HELIOS ESS datasheet (808-0046)
Discover Lithium Batteries
A Discover battery must have a compatible network port, such as a LYNK Port or AEbus Port, for communicating with a LYNK II device.
AES RACKMOUNT: 48-48-5120
HELIOS ESS: 52-48-16000
Selectronic Inverters
The LYNK II Communication Gateway is compatible with the following Selectronic inverters:
SPMC480-AU
SPMC481-AU
SPMC482-AU