SUNSYNK
This section provides information about integrating LYNK and AEbus network-enabled Discover Lithium Batteries using the LYNK II Communication Gateway with SUNSYNK power conversion devices in a managed (closed-loop) configuration.
Before installation and configuration, consult the relevant product documentation, including Manuals, Application Notes, and Installation and Configuration Guides.
SUNSYNK Documentation
Visit https://www.SUNSYNK.org/ for the most recent version of published documents.
SUNSYNK SINGLE-PHASE HYBRID INVERTER USER MANUAL
SUNSYNK SINGLE-PHASE HYBRID INVERTER INSTALLER MANUAL
SUNSYNK HYBRID PARITY (SUPER) INVERTER INSTALLER MANUAL
SUNSYNK THREE-PHASE HYBRID INVERTER INSTALLER MANUAL
SUNSYNK MAX USER MANUAL
Discover Energy Systems Documentation
Visit https://www.discoverenergysys.com for the most recent version of published documents.
AES RACKMOUNT Installation and Operation Manual (805-0043)
AES RACKMOUNT datasheet (808-0039)
HELIOS ESS Installation and Operation Manual (805-0090)
HELIOS ESS datasheet (808-0046)
Discover Lithium Batteries
A Discover battery must have a compatible network port, such as a LYNK Port or AEbus Port, for communicating with a LYNK II device.
AES RACKMOUNT: 48-48-5120, 48-48-5120-H
HELIOS ESS: 52-48-16000
SUNSYNK Inverters
The LYNK II Communication Gateway is compatible with the following SUNSYNK devices:
Single Phase
SUNSYNK-3K-SG04LP1
SUNSYNK-3.6K-SG04LP1
SUNSYNK-5K-SG04LP1
SUNSYNK-8K-SG05LP1
SUNSYNK-12K-SG01LP1
SUNSYNK-14K-SG01LP1
SUNSYNK-16K-SG01LP1
SUNSYNK MAX
Three Phase
SUNSYNK-8K-SG04LP3
SUNSYNK-10K-SG04LP3
SUNSYNK-12K-SG04LP3