Skip to main content
Skip table of contents

SUNSYNK

This section provides information about integrating LYNK and AEbus network-enabled Discover Lithium Batteries using the LYNK II Communication Gateway with SUNSYNK power conversion devices in a managed (closed-loop) configuration.

Before installation and configuration, consult the relevant product documentation, including Manuals, Application Notes, and Installation and Configuration Guides.

SUNSYNK Documentation

Visit https://www.SUNSYNK.org/ for the most recent version of published documents.

  • SUNSYNK SINGLE-PHASE HYBRID INVERTER USER MANUAL

  • SUNSYNK SINGLE-PHASE HYBRID INVERTER INSTALLER MANUAL

  • SUNSYNK HYBRID PARITY (SUPER) INVERTER INSTALLER MANUAL

  • SUNSYNK THREE-PHASE HYBRID INVERTER INSTALLER MANUAL

  • SUNSYNK MAX USER MANUAL

Discover Energy Systems Documentation

Visit https://www.discoverenergysys.com for the most recent version of published documents.

  • AES RACKMOUNT Installation and Operation Manual (805-0043)

  • AES RACKMOUNT datasheet (808-0039)

  • HELIOS ESS Installation and Operation Manual (805-0090)

  • HELIOS ESS datasheet (808-0046)


Discover Lithium Batteries

A Discover battery must have a compatible network port, such as a LYNK Port or AEbus Port, for communicating with a LYNK II device.

  • AES RACKMOUNT: 48-48-5120, 48-48-5120-H

  • HELIOS ESS: 52-48-16000

SUNSYNK Inverters

The LYNK II Communication Gateway is compatible with the following SUNSYNK devices:

Single Phase

  • SUNSYNK-3K-SG04LP1

  • SUNSYNK-3.6K-SG04LP1

  • SUNSYNK-5K-SG04LP1

  • SUNSYNK-8K-SG05LP1

  • SUNSYNK-12K-SG01LP1

  • SUNSYNK-14K-SG01LP1

  • SUNSYNK-16K-SG01LP1

  • SUNSYNK MAX

Three Phase

  • SUNSYNK-8K-SG04LP3

  • SUNSYNK-10K-SG04LP3

  • SUNSYNK-12K-SG04LP3

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.