This checklist is only for the battery energy storage system; further system-level decommissioning procedures on the full system may be required. Refer to the manuals of connected DC loads, power conversion equipment,
Disassemble, Recycle, and Dispose
|
PROCEDURE
|
CHECK
|
-
Open disconnect devices to ensure there is no electrical connection to any externally connected Power Conversion Equipment.
|
|
-
Turn off each battery one by one using the battery ON/OFF push buttons.
|
|
-
Use a multimeter to verify there is no voltage on the battery terminals.
|
|
-
Disconnect and remove battery cables from the inverter and batteries.
|
|
-
Disconnect and remove CAT6 or higher communication cables.
|
|
-
If using conduit box:
|
|
-
Remove the screws holding the battery to the Wall-Mount Adapter.
|
|
-
Using a two or three-person lift or mechanical aid, detach the battery from the Wall-Mount Adapter.
|
|
-
Remove the Wall-Mount fasteners and detach the Wall-Mount Bracket.
|
|
-
Recycle all recyclable components.
|
|
-
Dispose of unrecyclable components following local waste disposal guidelines.
|
|